Major Freight Hub

Los Angeles, California: America's Import Gateway

The ports of Los Angeles and Long Beach together form the nation's largest container port complex, handling approximately 40% of U.S. containerized imports. When goods "arrive from Asia," they most likely arrive here first, making port-to-inland transfer one of the most critical chokepoints in U.S. supply chains.

LA's Role in U.S. Imports

Los Angeles dominates U.S. import logistics for fundamental reasons:

  • Trans-Pacific gateway: LA/Long Beach offers the shortest route from Asian manufacturing centers. Container ships from China, Vietnam, and other Asian origins land here first.
  • Infrastructure scale: The port complex includes 13 container terminals, on-dock rail connections, and extensive intermodal ramps. This capacity concentration is unmatched elsewhere.
  • Inland Empire warehousing: The adjacent Inland Empire contains over 1 billion square feet of warehouse space, enabling immediate transloading and distribution.
  • Rail connections: BNSF and Union Pacific operate dedicated intermodal trains from LA to Chicago, Dallas, Memphis, and beyond.

Top Connected Corridors

LA → Chicago (Intermodal)

The nation's highest-volume intermodal lane. Both BNSF and Union Pacific run dedicated double-stack trains daily. Rail transit typically runs 4–6 days with variance depending on conditions.

LA → Dallas

I-10 corridor east to Dallas-Fort Worth. Both truck and rail serve this lane, with truckload running 2–3 days under normal conditions.

Port → Inland Empire (Drayage)

Short-haul container movements from port terminals to Inland Empire warehouses. Despite short distance, this corridor is often the primary bottleneck in import logistics.

LA → Northern California

I-5 corridor north to the San Francisco Bay Area and Central Valley. This lane serves both distribution to Northern California and agricultural export flows south to port.

Seasonal Risks and Delay Patterns

  • Peak import season (August–October): Retailers stock for the holidays, creating maximum port congestion.Port-to-inland transfers back up.
  • Post-Lunar New Year (February–March): Asian manufacturing resumes, sending a wave of containers. Warehouses may still be clearing holiday inventory.
  • Labor contract periods: ILWU contract negotiations can create work slowdowns or anticipatory import surges as shippers rush cargo ahead of potential disruptions.
  • Winter storms:Donner Pass closures on I-80 affect Northern California freight, pushing more volume to southern routes.

Common Delay Drivers

  • Vessel bunching: When ships arrive in clusters (due to weather delays, port congestion elsewhere, or schedule recovery), terminals become overwhelmed. Container dwell times extend from days to weeks.
  • Chassis availability: Containers can't move without truck chassis. Pool chassis often aren't where they're needed, creating "chassis hunts" that add hours to each move.
  • Warehouse appointments: Inland Empire receivers schedule dock appointments in tight windows. Drayage drivers who miss appointments wait days for reschedules.
  • Highway congestion: The I-710 (port corridor), I-10, and I-15 experience chronic congestion that extends drayage times and consumes driver hours.

Frequently Asked Questions

Why do most U.S. imports come through Los Angeles?
The San Pedro Bay ports (LA and Long Beach) offer the shortest shipping route from Asia, where most consumer goods are manufactured. The ports have invested heavily in infrastructure, creating a virtuous cycle where volume attracts more shipping lines, which attracts more volume.
What is the Inland Empire and why does it matter?
The Inland Empire (Riverside and San Bernardino counties) hosts the largest concentration of warehouses in the U.S., most serving as transloading points for containers arriving at LA/Long Beach. Nearly all port-bound containers pass through this region for distribution.
When is LA port congestion worst?
Peak import season runs August through October as retailers stock for the holidays. Post-Lunar New Year (February-March) also sees import surges. Labor contract negotiations with the ILWU periodically create slowdowns or anticipatory volume spikes.
Last updated: